October 09, 2020
Have CycleTracks On TenderSure Roads.
A dedicated track is required at HSR Layout, Koramangala, Adugodi, Indiranagar,
Ulsoor, Vasanthnagar, HRBR Layout, HBR Layout, Kanchenahalli and other places in
the first phase as approved by the Cabinet," reads DULT&China flow meter39;s letter. Ravichandar
alludes to the fallacy of painting cycle lanes, saying a six-inch barrier should
be built in order to maintain lane discipline.
So the BBMP is requested to
accommodate at least 3-meter width on the footpaths along the roads where the
white topping or TenderSure work is going on," the letter read." In 2012, civic
agencies painted cycle lanes in Jayanagar and Basavangudi but the project
backfired as the reserved cycle lanes were used by motorists." Ola, other
startups get in line to provide cycles on hireAs the government makes an effort
towards replicating the Mysuru model here in the city, a slew of start-ups have
come to the fore, ensuring a healthy level of competition. Yulu has said they
will start services in a month. Our tariff plans are equally competitive as
well. A physical barrier for the safety of the cyclists will also be built.
Depending on the feasibility, we will see if we can."end-ofTags: cycling tracks,
traffic snarls, ola pedal, bbmp, directorate of urban land transport.
Trees
provide obstructions in certain interior parts of the city, Nagaraj pointed out,
saying it is not possible to have cycle tracks everywhere. Urban Expert, V
Ravichandar said, "Our infrastructure is under stress but cycle tracks are still
possible. "At present, we have cycle tracks on TenderSure roads. We are not
looking the competitive aspect right now, at least not until the full-fledged
launch of our services. The DULT’s letter to the BBMP requesting the
construction of these lanes, met with a lukewarm response from the latter, who
claim there are too many obstructions."Another startup, Yulu, which means
'simple in Chinese, has been launched in Bengaluru by Amit Gupta, the co-founder
of InMobi. It said that the design would require 3-meter or more wide space
depending on the availability # for pedestrians and cyclists.Murali Krishna from
DULT said, "It will take upto five months to begin. The non-motorised
infrastructure includes walkways for pedestrian safety apart from cycle tracks.
Once the white topping is completed it would be difficult to accommodate cycle
tracks or to change the structure of the road.Krishna, however, promises that
there will be a significant gap between roads and the footpaths where the
parking hubs will come up. N. The Directorate of Urban Land Transport (DULT) is
now planning to have separate cycle tracks in two zones of the Central Business
District (CBD). ‘Dedicated lanes will be a challenge’On November 14, the
Directorate of Urban Land Transportation (DULT) had written a letter to BBMP
asking them to construct dedicated tracks for bicycles wherever the
white-topping and TenderSure work is taking place.
(Photo: DC)Dedicated cycling
tracks across the Central Business District, the latest initiative by the
Directorate of Urban Land Transport, could be the answer to Bengaluru’s growing
traffic snarls.The special officer of the DULT said that the Public Bicycle
Sharing (PBS) model, although it is aimed at citizens employed with different
sectors, will generate employment and be feasible for tourists too.Read | Guest
column: Why is the BBMP averse to constructing more tracks?DULT, which had
originally planned to procure over 6,000 bicycles, is now looking at an even
larger number, as docking stations have been replaced with parking hubs. The
tenders for bicycles will be finalised by the end of December," he added. The
re-imagining of streets, keeping pedestrians in mind and providing safe
infrastructure is a pertinent aspect, in which the BBMP is a major stakeholder.
Posted by: lectromagowme at
08:04 AM
| Comments (8)
| Add Comment
Post contains 609 words, total size 4 kb.
<< Page 1 of 1 >>
19kb generated in CPU 0.0096, elapsed 0.035 seconds.
34 queries taking 0.0276 seconds, 60 records returned.
Powered by Minx 1.1.6c-pink.
34 queries taking 0.0276 seconds, 60 records returned.
Powered by Minx 1.1.6c-pink.